{"article":{"id":1924,"slug":"bhpetrol-and-mara-inc-launch-solar-pv-systems-at-50-petrol-stations-across-klang-valley","title":"BHPetrol and MARA Inc Launch Solar PV Systems at 50 Petrol Stations Across Klang Valley","category":"news","summary":"BHPetrol and MARA Inc are installing 1.4 MWp solar PV systems at 50 petrol stations across Klang Valley, with 16 already operational and full completion targeted by end of 2026, reducing 1,347 tonnes of CO2 annually.","content":"## English\n\n* **Boustead Petroleum Marketing Sdn Bhd (BHPetrol)** and **MARA Incorporated Sdn Bhd (MARA Inc)** have launched a phased project to install solar photovoltaic (PV) systems at **50 BHPetrol stations** across the Klang Valley, with completion targeted by end of 2026\n* As of July 2026, **16 stations** have already completed installation and are operating with solar PV systems, with the remaining 34 stations to be implemented in phases\n* The total solar PV capacity across all 50 stations is **1.4 megawatt peak (MWp)**, expected to reduce carbon emissions by approximately **1,347 tonnes of CO₂ annually** once fully completed\n* MARA Inc CEO **Faizul Idzhar Ahmad Yazi** confirmed the company is committed to ensuring all 50 stations are fully operational before year-end, including testing, commissioning, and licensing approvals\n* BHPetrol acting CEO **Fardzi Shah Razali** noted the company operates approximately **420 petrol stations** throughout Peninsular Malaysia, with targets for additional solar installations next year still under discussion\n* Not all 420 BHPetrol stations are suitable for solar — feasibility depends on location, sufficient open space, and adequate sunlight exposure, with some urban stations near high-rise buildings unsuitable\n* BHPetrol is targeting at least a **10% reduction in energy bills** across its operations through solar adoption\n* MARA Inc is also expanding solar installations at **MARA colleges and institutions**, and is involved in **large-scale solar (LSS) projects** with combined capacity exceeding **100 MW** on the East Coast\n* The initiative aligns with Malaysia's **National Energy Transition Roadmap (NETR)** to accelerate the transition to green technology and promote sustainable business practices\n\n## 中文\n\n* **Boustead Petroleum Marketing私人有限公司（BHPetrol）**与**MARA Incorporated私人有限公司（MARA Inc）**已启动分阶段项目，在巴生谷地区的**50座BHPetrol加油站**安装太阳能光伏系统，目标于2026年底前完成\n* 截至2026年7月，已有**16座加油站**完成安装并投入运营，其余34座将分阶段实施\n* 50座加油站的太阳能光伏总装机容量为**1.4兆峰（MWp）**，全面建成后预计每年减少约**1,347吨二氧化碳**排放\n* MARA Inc首席执行官**Faizul Idzhar Ahmad Yazi**确认公司致力于确保所有50座加油站在年底前全面投入运营，包括测试、调试及取得相关许可证\n* BHPetrol代理首席执行官**Fardzi Shah Razali**指出，公司在马来西亚半岛运营约**420座加油站**，明年的额外太阳能安装目标仍在讨论中\n* 并非所有420座BHPetrol加油站都适合安装太阳能系统——可行性取决于场地位置、是否有足够空地及充足日照，部分位于高楼附近的城市站点不适合\n* BHPetrol的目标是通过太阳能应用实现至少**10%的能源费用削减**\n* MARA Inc还在**MARA学院及机构**扩展太阳能安装，并参与东海岸总容量超过**100兆瓦（MW）**的**大型太阳能（LSS）项目**\n* 该倡议与马来西亚**《国家能源转型路线图》（NETR）**相呼应，加速绿色技术转型并推动可持续商业模式","html_content":"<h2>English</h2>\n<ul>\n<li><strong>Boustead Petroleum Marketing Sdn Bhd (BHPetrol)</strong> and <strong>MARA Incorporated Sdn Bhd (MARA Inc)</strong> have launched a phased project to install solar photovoltaic (PV) systems at <strong>50 BHPetrol stations</strong> across the Klang Valley, with completion targeted by end of 2026</li>\n<li>As of July 2026, <strong>16 stations</strong> have already completed installation and are operating with solar PV systems, with the remaining 34 stations to be implemented in phases</li>\n<li>The total solar PV capacity across all 50 stations is <strong>1.4 megawatt peak (MWp)</strong>, expected to reduce carbon emissions by approximately <strong>1,347 tonnes of CO₂ annually</strong> once fully completed</li>\n<li>MARA Inc CEO <strong>Faizul Idzhar Ahmad Yazi</strong> confirmed the company is committed to ensuring all 50 stations are fully operational before year-end, including testing, commissioning, and licensing approvals</li>\n<li>BHPetrol acting CEO <strong>Fardzi Shah Razali</strong> noted the company operates approximately <strong>420 petrol stations</strong> throughout Peninsular Malaysia, with targets for additional solar installations next year still under discussion</li>\n<li>Not all 420 BHPetrol stations are suitable for solar — feasibility depends on location, sufficient open space, and adequate sunlight exposure, with some urban stations near high-rise buildings unsuitable</li>\n<li>BHPetrol is targeting at least a <strong>10% reduction in energy bills</strong> across its operations through solar adoption</li>\n<li>MARA Inc is also expanding solar installations at <strong>MARA colleges and institutions</strong>, and is involved in <strong>large-scale solar (LSS) projects</strong> with combined capacity exceeding <strong>100 MW</strong> on the East Coast</li>\n<li>The initiative aligns with Malaysia&#39;s <strong>National Energy Transition Roadmap (NETR)</strong> to accelerate the transition to green technology and promote sustainable business practices</li>\n</ul>\n<h2>中文</h2>\n<ul>\n<li><strong>Boustead Petroleum Marketing私人有限公司（BHPetrol）<strong>与</strong>MARA Incorporated私人有限公司（MARA Inc）<strong>已启动分阶段项目，在巴生谷地区的</strong>50座BHPetrol加油站</strong>安装太阳能光伏系统，目标于2026年底前完成</li>\n<li>截至2026年7月，已有<strong>16座加油站</strong>完成安装并投入运营，其余34座将分阶段实施</li>\n<li>50座加油站的太阳能光伏总装机容量为<strong>1.4兆峰（MWp）</strong>，全面建成后预计每年减少约<strong>1,347吨二氧化碳</strong>排放</li>\n<li>MARA Inc首席执行官<strong>Faizul Idzhar Ahmad Yazi</strong>确认公司致力于确保所有50座加油站在年底前全面投入运营，包括测试、调试及取得相关许可证</li>\n<li>BHPetrol代理首席执行官<strong>Fardzi Shah Razali</strong>指出，公司在马来西亚半岛运营约<strong>420座加油站</strong>，明年的额外太阳能安装目标仍在讨论中</li>\n<li>并非所有420座BHPetrol加油站都适合安装太阳能系统——可行性取决于场地位置、是否有足够空地及充足日照，部分位于高楼附近的城市站点不适合</li>\n<li>BHPetrol的目标是通过太阳能应用实现至少<strong>10%的能源费用削减</strong></li>\n<li>MARA Inc还在<strong>MARA学院及机构</strong>扩展太阳能安装，并参与东海岸总容量超过<strong>100兆瓦（MW）<strong>的</strong>大型太阳能（LSS）项目</strong></li>\n<li>该倡议与马来西亚**《国家能源转型路线图》（NETR）**相呼应，加速绿色技术转型并推动可持续商业模式</li>\n</ul>\n","author":"Eternalgy Market Intelligence Team","tags":"solar, malaysia, market","meta_description":"BHPetrol and MARA Inc launch 1.4 MWp solar PV project at 50 Klang Valley petrol stations, targeting 10% energy cost reduction and 1,347 tonnes CO2 savings annually by end of 2026.","published":true,"created_at":"2026-07-04T10:00:00.000Z","updated_at":"2026-07-04T21:03:30.292Z","source_url":"https://www.sinardaily.my/article/737680/focus/money/sun-powered-pumps-the-new-alliance-charging-up-malaysias-green-transition","source_name":"Sinar Daily","published_at":"2026-07-04T10:00:00.000Z","noindex":false,"marketing_line":"Eternalgy: trusted solar PV EPC in Malaysia (CIDB G3, SEDA RPVI). Go solar: https://eternalgy.me/bhpetrol-and-mara-inc-launch-solar-pv-systems-at-50-petrol-stations-across-klang-valley","marketing_line_cn":"Eternalgy是马来西亚值得信赖的太阳能光伏EPC（CIDB G3和SEDA RPVI认证）。选择太阳能：https://eternalgy.me/bhpetrol-and-mara-inc-launch-solar-pv-systems-at-50-petrol-stations-across-klang-valley"},"schemaData":{"@context":"https://schema.org","@graph":[{"@type":"NewsArticle","@id":"https://eternalgy.me/bhpetrol-and-mara-inc-launch-solar-pv-systems-at-50-petrol-stations-across-klang-valley#newsarticle","headline":"BHPetrol and MARA Inc Launch Solar PV Systems at 50 Petrol Stations Across Klang Valley","description":"BHPetrol and MARA Inc are installing 1.4 MWp solar PV systems at 50 petrol stations across Klang Valley, with 16 already operational and full completion targeted by end of 2026, reducing 1,347 tonnes of CO2 annually.","image":["https://eternalgy.me/logo.png"],"datePublished":"2026-07-04T10:00:00.000Z","dateModified":"2026-07-04T21:03:30.292Z","author":{"@type":"Person","name":"Eternalgy Market Intelligence Team"},"publisher":{"@type":"Organization","name":"Eternalgy Sdn Bhd","url":"https://eternalgy.me","logo":{"@type":"ImageObject","url":"https://eternalgy.me/logo.png"},"foundingDate":"2023-09-15","sameAs":["https://eternalgy.com","https://solarpanels.my","https://solarpanels.onesync.my","https://solar100.com.my"]},"mainEntityOfPage":"https://eternalgy.me/bhpetrol-and-mara-inc-launch-solar-pv-systems-at-50-petrol-stations-across-klang-valley","isBasedOn":"https://www.sinardaily.my/article/737680/focus/money/sun-powered-pumps-the-new-alliance-charging-up-malaysias-green-transition"},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://eternalgy.me"},{"@type":"ListItem","position":2,"name":"Energy News","item":"https://eternalgy.me/news"},{"@type":"ListItem","position":3,"name":"BHPetrol and MARA Inc Launch Solar PV Systems at 50 Petrol Stations Across Klang Valley","item":"https://eternalgy.me/bhpetrol-and-mara-inc-launch-solar-pv-systems-at-50-petrol-stations-across-klang-valley"}]}]}}