# Heineken Malaysia Powers Brewery with 3,500 Solar Panels and 1.9 MW Rooftop System *Author: Eternalgy Market Intelligence Team | Category: news | Published: Wed Jun 17 2026 08:22:27 GMT+0000 (Coordinated Universal Time)* ## English * **HEINEKEN Malaysia installed 3,500 solar panels** on its Sungai Way Brewery rooftop in Petaling Jaya, covering over 9,000 square metres * **System capacity: 1.9 MW**, generating 2,646 MWh of electricity annually — covering approximately 17% of the brewery's total power needs * **Emissions reduction: 1,634 tonnes of CO₂ annually** from the rooftop solar installation * **100% renewable electricity since March 2022** via TNB's Green Electricity Tariff (GET) program — the brewery runs entirely on green power * **Scope 1 and 2 emissions reduced by 45% since 2022**, demonstrating measurable progress on decarbonisation targets * **Partnership with Blueleaf Energy** (independent power producer) — the system went live in July 2024 * **Biogas from wastewater treatment** supplies an additional 4% of the brewery's thermal energy needs * **40 top suppliers onboarded** to a UN-linked ESG platform for supply chain sustainability tracking * **Net-zero carbon target: 2040** — part of HEINEKEN's global 'Brew a Better World' strategy * **Malaysia's industrial solar adoption** is accelerating as energy costs rise under TNB's RP4 tariff framework ## 中文 * **喜力马来西亚在八打灵再也双威啤酒厂屋顶安装了3,500块太阳能板**,覆盖面积超过9,000平方米 * **系统容量1.9兆瓦**,年发电量2,646兆瓦时——约占啤酒厂总用电需求的17% * **年减排1,634吨二氧化碳**来自屋顶太阳能安装 * **自2022年3月起实现100%可再生电力**,通过马来西亚国家能源公司(TNB)绿色电力关税(GET)计划——啤酒厂完全使用绿色电力 * **自2022年以来范围1和范围2排放量减少45%**,展示了脱碳目标的可衡量进展 * **与Blueleaf Energy合作**(独立发电商)——系统于2024年7月投入运营 * **废水处理产生的沼气**额外提供啤酒厂4%的热能需求 * **40家主要供应商已加入**联合国关联的ESG平台,用于供应链可持续性追踪 * **净零碳排放目标:2040年**——喜力全球「酿造更美好世界」战略的一部分 * **马来西亚工业太阳能采用正在加速**,因TNB的RP4关税框架下能源成本上升