# Malaysia Accelerates Clean Energy Shift: 6.5 GW Solar Growth Driven by Floating PV *Author: Solar PV Expert | Category: news | Published: Wed Jun 10 2026 09:26:09 GMT+0000 (Coordinated Universal Time)* ### English * **Rapid Capacity Growth**: Malaysia’s solar photovoltaic (PV) capacity is projected to surpass 6.5 GW between 2026 and 2029. * **Policy Drivers**: Growth is primarily fueled by the upcoming Large Scale Solar 6 (LSS6) tenders and the Corporate Renewable Energy Supply Scheme (CRESS). * **Market Opportunity**: The engineering, procurement, construction, and commissioning (EPCC) sector expects contracts valued between MYR 13 billion and MYR 23 billion over the next five years. * **Floating Solar Expansion**: To address limited land availability, Malaysia is leveraging its estimated 16.5 GW of floating solar potential. * **Technical Advantages**: Floating solar arrays provide 5–15% higher energy yield due to the cooling effect of water and better solar exposure. * **Strategic Integration**: New projects, such as the 595 MW installation at Kenyir Lake, are increasingly integrating Battery Energy Storage Systems (BESS) to manage intermittency. ### 中文 (Chinese) * **产能快速增长**:预计马来西亚太阳能光伏(PV)装机容量将在2026年至2029年间超过6.5吉瓦(GW)。 * **政策驱动**:增长主要由即将推出的“大型太阳能6”(LSS6)招标计划和“企业可再生能源供应计划”(CRESS)推动。 * **市场机遇**:预计未来五年,工程、采购、施工和调试(EPCC)领域的合同总值将达到130亿至230亿马来西亚令吉。 * **浮动太阳能扩展**:为解决土地资源有限的问题,马来西亚正利用其约16.5吉瓦的浮动太阳能潜力。 * **技术优势**:得益于水的冷却效应和更好的光照条件,浮动太阳能阵列的发电量可提高5%至15%。 * **战略整合**:如肯逸湖(Kenyir Lake)595兆瓦项目等新工程,正日益结合电池储能系统(BESS)以应对能源间歇性问题。