{"article":{"id":104,"slug":"malaysia-commences-construction-of-300mw-floating-solar-power-plant","title":"Malaysia Commences Construction of 300MW Floating Solar Power Plant","category":"news","summary":"    English     Project Overview  : Construction has officially begun on the 300 MW Bestari Large-Scale Solar (LSS5) project in Bestari Jaya, Selangor.     Capa","content":"### English\n* **Project Overview**: Construction has officially begun on the 300 MW Bestari Large-Scale Solar (LSS5) project in Bestari Jaya, Selangor.\n* **Capacity and Scale**: Upon completion, it will be the largest floating solar plant in Malaysia and one of the largest in Southeast Asia, covering approximately 430–437 hectares.\n* **Economic Impact**: The project is valued at over US$220 million (approx. RM1 billion) and is expected to generate 640 million kWh of electricity annually, powering 150,000 households.\n* **Strategic Development**: Developed by a consortium led by Edra Power Holdings (a CGN subsidiary), Worldwide Holdings, and Rotaka Engineering, it aims to support Malaysia’s goal of 40% renewable energy capacity by 2035.\n* **Sustainability**: The plant utilizes an abandoned mining lake, repurposing idle land while incorporating advanced water-quality protection measures.\n* **Timeline**: Commercial operations are scheduled to begin in July 2027 under a 21-year Power Purchase Agreement (PPA).\n\n### 中文 (Chinese)\n* **项目概况**：马来西亚雪兰莪州 Bestari Jaya 的 300 兆瓦 (MW) Bestari 大型太阳能 (LSS5) 项目已正式开工。\n* **规模与容量**：该项目建成后将成为马来西亚最大的漂浮式光伏电站，也是东南亚最大的电站之一，占地约 430 至 437 公顷。\n* **经济影响**：项目投资额超过 2.2 亿美元（约 10 亿令吉），预计每年发电约 6.4 亿千瓦时，可为 15 万户家庭提供电力。\n* **战略目标**：该项目由中广核下属的埃德拉电力控股 (Edra Power)、Worldwide Holdings 和 Rotaka Engineering 组成的财团开发，旨在助力马来西亚实现 2035 年可再生能源占比达到 40% 的目标。\n* **可持续性**：电站选址于废弃矿湖，通过改造闲置土地实现清洁能源转型，并配套了先进的水质保护技术。\n* **时间表**：根据为期 21 年的购电协议 (PPA)，该项目预计于 2027 年 7 月正式投入商业运营。","html_content":"<h3>English</h3>\n<ul>\n<li><strong>Project Overview</strong>: Construction has officially begun on the 300 MW Bestari Large-Scale Solar (LSS5) project in Bestari Jaya, Selangor.</li>\n<li><strong>Capacity and Scale</strong>: Upon completion, it will be the largest floating solar plant in Malaysia and one of the largest in Southeast Asia, covering approximately 430–437 hectares.</li>\n<li><strong>Economic Impact</strong>: The project is valued at over US$220 million (approx. RM1 billion) and is expected to generate 640 million kWh of electricity annually, powering 150,000 households.</li>\n<li><strong>Strategic Development</strong>: Developed by a consortium led by Edra Power Holdings (a CGN subsidiary), Worldwide Holdings, and Rotaka Engineering, it aims to support Malaysia’s goal of 40% renewable energy capacity by 2035.</li>\n<li><strong>Sustainability</strong>: The plant utilizes an abandoned mining lake, repurposing idle land while incorporating advanced water-quality protection measures.</li>\n<li><strong>Timeline</strong>: Commercial operations are scheduled to begin in July 2027 under a 21-year Power Purchase Agreement (PPA).</li>\n</ul>\n<h3>中文 (Chinese)</h3>\n<ul>\n<li><strong>项目概况</strong>：马来西亚雪兰莪州 Bestari Jaya 的 300 兆瓦 (MW) Bestari 大型太阳能 (LSS5) 项目已正式开工。</li>\n<li><strong>规模与容量</strong>：该项目建成后将成为马来西亚最大的漂浮式光伏电站，也是东南亚最大的电站之一，占地约 430 至 437 公顷。</li>\n<li><strong>经济影响</strong>：项目投资额超过 2.2 亿美元（约 10 亿令吉），预计每年发电约 6.4 亿千瓦时，可为 15 万户家庭提供电力。</li>\n<li><strong>战略目标</strong>：该项目由中广核下属的埃德拉电力控股 (Edra Power)、Worldwide Holdings 和 Rotaka Engineering 组成的财团开发，旨在助力马来西亚实现 2035 年可再生能源占比达到 40% 的目标。</li>\n<li><strong>可持续性</strong>：电站选址于废弃矿湖，通过改造闲置土地实现清洁能源转型，并配套了先进的水质保护技术。</li>\n<li><strong>时间表</strong>：根据为期 21 年的购电协议 (PPA)，该项目预计于 2027 年 7 月正式投入商业运营。</li>\n</ul>\n","author":"Solar PV Expert","tags":"","meta_description":"    English     Project Overview  : Construction has officially begun on the 300 MW Bestari Large-Scale Solar (LSS5) project in Bestari Jaya, Selangor","published":true,"created_at":"2026-06-10T09:23:25.572Z","updated_at":"2026-06-12T06:52:33.281Z","source_url":"https://tvbrics.com/en/news/malaysia-launches-construction-of-largest-floating-solar-plant-with-300-mw-capacity/","source_name":null,"published_at":null,"noindex":false,"marketing_line":"Eternalgy is your trusted solar PV EPC in Malaysia — CIDB G3 & SEDA RPVI certified. Go solar: https://eternalgy.me/malaysia-commences-construction-of-300mw-floating-solar-power-plant","marketing_line_cn":"Eternalgy是您值得信赖的马来西亚太阳能光伏EPC——持有CIDB G3和SEDA RPVI认证。立即选择太阳能：https://eternalgy.me/malaysia-commences-construction-of-300mw-floating-solar-power-plant"},"schemaData":{"@context":"https://schema.org","@graph":[{"@type":"NewsArticle","@id":"https://eternalgy.me/malaysia-commences-construction-of-300mw-floating-solar-power-plant#newsarticle","headline":"Malaysia Commences Construction of 300MW Floating Solar Power Plant","description":"    English     Project Overview  : Construction has officially begun on the 300 MW Bestari Large-Scale Solar (LSS5) project in Bestari Jaya, Selangor.     Capa","image":["https://eternalgy.me/logo.png"],"datePublished":"2026-06-10T09:23:25.572Z","dateModified":"2026-06-12T06:52:33.281Z","author":{"@type":"Person","name":"Solar PV Expert"},"publisher":{"@type":"Organization","name":"Eternalgy Sdn Bhd","url":"https://eternalgy.me","logo":{"@type":"ImageObject","url":"https://eternalgy.me/logo.png"},"foundingDate":"2023-09-15","sameAs":["https://eternalgy.com","https://solarpanels.my","https://solarpanels.onesync.my","https://solar100.com.my"]},"mainEntityOfPage":"https://eternalgy.me/malaysia-commences-construction-of-300mw-floating-solar-power-plant","isBasedOn":"https://tvbrics.com/en/news/malaysia-launches-construction-of-largest-floating-solar-plant-with-300-mw-capacity/"},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://eternalgy.me"},{"@type":"ListItem","position":2,"name":"Energy News","item":"https://eternalgy.me/news"},{"@type":"ListItem","position":3,"name":"Malaysia Commences Construction of 300MW Floating Solar Power Plant","item":"https://eternalgy.me/malaysia-commences-construction-of-300mw-floating-solar-power-plant"}]}]}}