{"article":{"id":1866,"slug":"malaysia-parliament-debates-cress-corporate-renewable-energy-scheme-implementation","title":"Malaysia Parliament Debates CRESS Corporate Renewable Energy Scheme Implementation","category":"news","summary":"Malaysia's Parliament debated CRESS corporate renewable energy scheme implementation on June 25, covering SAC rates, data centre implications, and BESS integration.","content":"## English\n\n* The **Dewan Rakyat** (Malaysian Parliament) on June 25, 2026 deliberated on the implementation of the **Corporate Renewable Energy Supply Scheme (CRESS)**\n* **Rodziah Ismail (PH-Ampang)** questioned the Energy Minister on CRESS implementation status and the number of industry participants during the minister's question time\n* She also sought findings from the **System Access Charge (SAC) rate review** and its implications for Malaysia's aspirations to become a **regional data centre hub**\n* Questions covered operating costs for data centres, the **Corporate Green Power Programme (CGPP)**, and **Battery Energy Storage Systems (BESS)**\n* CRESS is a framework allowing corporate entities to **procure renewable energy directly from developers** through the national grid under a **Third-Party Access (TPA) model**\n* The scheme aligns with Malaysia's target of achieving **70% renewable energy** in its capacity mix **by 2050**\n* Other parliamentary agenda items included **global energy crisis and rising job losses** (raised by Mohd Syahir Che Sulaiman, PN-Bachok) and **fuel subsidy targeting using MyKad**\n* The second meeting of the fifth session of the 15th Parliament spans **16 days until July 16, 2026**\n\n## 中文\n\n* 2026年6月25日，马来西亚**国会下议院**就**企业可再生能源供应计划（CRESS）**的实施情况进行审议\n* **罗兹雅依斯迈尔（公正党-安邦）**在部长问答环节就CRESS实施进展及参与企业数量向能源部长提问\n* 她同时就**系统接入费（SAC）费率审查**结果及其对马来西亚成为**区域数据中心枢纽**愿景的影响提出质询\n* 问题涵盖数据中心运营成本、**企业绿色电力计划（CGPP）**及**电池储能系统（BESS）**\n* CRESS是一个允许企业通过国家电网以**第三方接入（TPA）模式**直接向开发商**采购可再生能源**的框架\n* 该计划与马来西亚到**2050年**实现发电组合中**70%可再生能源**的目标一致\n* 其他议程包括**全球能源危机与失业率上升**（由莫哈末赛希尔提出）及**使用MyKad进行燃油补贴精准化**\n* 第十五届国会第五会期第二次会议为期**16天，至2026年7月16日结束**","html_content":"<h2>English</h2>\n<ul>\n<li>The <strong>Dewan Rakyat</strong> (Malaysian Parliament) on June 25, 2026 deliberated on the implementation of the <strong>Corporate Renewable Energy Supply Scheme (CRESS)</strong></li>\n<li><strong>Rodziah Ismail (PH-Ampang)</strong> questioned the Energy Minister on CRESS implementation status and the number of industry participants during the minister&#39;s question time</li>\n<li>She also sought findings from the <strong>System Access Charge (SAC) rate review</strong> and its implications for Malaysia&#39;s aspirations to become a <strong>regional data centre hub</strong></li>\n<li>Questions covered operating costs for data centres, the <strong>Corporate Green Power Programme (CGPP)</strong>, and <strong>Battery Energy Storage Systems (BESS)</strong></li>\n<li>CRESS is a framework allowing corporate entities to <strong>procure renewable energy directly from developers</strong> through the national grid under a <strong>Third-Party Access (TPA) model</strong></li>\n<li>The scheme aligns with Malaysia&#39;s target of achieving <strong>70% renewable energy</strong> in its capacity mix <strong>by 2050</strong></li>\n<li>Other parliamentary agenda items included <strong>global energy crisis and rising job losses</strong> (raised by Mohd Syahir Che Sulaiman, PN-Bachok) and <strong>fuel subsidy targeting using MyKad</strong></li>\n<li>The second meeting of the fifth session of the 15th Parliament spans <strong>16 days until July 16, 2026</strong></li>\n</ul>\n<h2>中文</h2>\n<ul>\n<li>2026年6月25日，马来西亚<strong>国会下议院</strong>就**企业可再生能源供应计划（CRESS）**的实施情况进行审议</li>\n<li>**罗兹雅依斯迈尔（公正党-安邦）**在部长问答环节就CRESS实施进展及参与企业数量向能源部长提问</li>\n<li>她同时就<strong>系统接入费（SAC）费率审查</strong>结果及其对马来西亚成为<strong>区域数据中心枢纽</strong>愿景的影响提出质询</li>\n<li>问题涵盖数据中心运营成本、<strong>企业绿色电力计划（CGPP）<strong>及</strong>电池储能系统（BESS）</strong></li>\n<li>CRESS是一个允许企业通过国家电网以<strong>第三方接入（TPA）模式</strong>直接向开发商<strong>采购可再生能源</strong>的框架</li>\n<li>该计划与马来西亚到<strong>2050年</strong>实现发电组合中<strong>70%可再生能源</strong>的目标一致</li>\n<li>其他议程包括<strong>全球能源危机与失业率上升</strong>（由莫哈末赛希尔提出）及<strong>使用MyKad进行燃油补贴精准化</strong></li>\n<li>第十五届国会第五会期第二次会议为期<strong>16天，至2026年7月16日结束</strong></li>\n</ul>\n","author":"Eternalgy Market Intelligence Team","tags":"policy, malaysia, solar","meta_description":"Malaysia Parliament debates CRESS corporate renewable energy scheme — SAC rates, data centre hub implications, and BESS discussed in Dewan Rakyat.","published":true,"created_at":"2026-06-25T00:00:00.000Z","updated_at":"2026-06-25T21:06:54.778Z","source_url":"https://theedgemalaysia.com/node/808204","source_name":"The Edge Malaysia","published_at":"2026-06-25T00:00:00.000Z","noindex":false,"marketing_line":"Stay ahead of Malaysia's energy policies. Eternalgy helps you navigate solar & EV incentives: https://eternalgy.me/malaysia-parliament-debates-cress-corporate-renewable-energy-scheme-implementation","marketing_line_cn":"紧跟马来西亚能源政策。Eternalgy助您把握太阳能和电动汽车补贴机遇：https://eternalgy.me/malaysia-parliament-debates-cress-corporate-renewable-energy-scheme-implementation"},"schemaData":{"@context":"https://schema.org","@graph":[{"@type":"NewsArticle","@id":"https://eternalgy.me/malaysia-parliament-debates-cress-corporate-renewable-energy-scheme-implementation#newsarticle","headline":"Malaysia Parliament Debates CRESS Corporate Renewable Energy Scheme Implementation","description":"Malaysia's Parliament debated CRESS corporate renewable energy scheme implementation on June 25, covering SAC rates, data centre implications, and BESS integration.","image":["https://eternalgy.me/logo.png"],"datePublished":"2026-06-25T00:00:00.000Z","dateModified":"2026-06-25T21:06:54.778Z","author":{"@type":"Person","name":"Eternalgy Market Intelligence Team"},"publisher":{"@type":"Organization","name":"Eternalgy Sdn Bhd","url":"https://eternalgy.me","logo":{"@type":"ImageObject","url":"https://eternalgy.me/logo.png"},"foundingDate":"2023-09-15","sameAs":["https://eternalgy.com","https://solarpanels.my","https://solarpanels.onesync.my","https://solar100.com.my"]},"mainEntityOfPage":"https://eternalgy.me/malaysia-parliament-debates-cress-corporate-renewable-energy-scheme-implementation","isBasedOn":"https://theedgemalaysia.com/node/808204"},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://eternalgy.me"},{"@type":"ListItem","position":2,"name":"Energy News","item":"https://eternalgy.me/news"},{"@type":"ListItem","position":3,"name":"Malaysia Parliament Debates CRESS Corporate Renewable Energy Scheme Implementation","item":"https://eternalgy.me/malaysia-parliament-debates-cress-corporate-renewable-energy-scheme-implementation"}]}]}}