{"article":{"id":225,"slug":"malaysia-revives-nuclear-energy-ambitions-to-achieve-net-zero-goals","title":"Malaysia Revives Nuclear Energy Ambitions to Achieve Net-Zero Goals","category":"news","summary":"    English     Policy Integration:   The 13th Malaysia Plan (RMK13, 2026–2030) officially incorporates nuclear power to strengthen energy security and support ","content":"### English\n* **Policy Integration:** The 13th Malaysia Plan (RMK13, 2026–2030) officially incorporates nuclear power to strengthen energy security and support the 2050 Net-Zero target.\n* **Decarbonization Targets:** Malaysia aims for 40% renewable energy by 2040 and 70% by 2050, with a full phase-out of coal-fired power plants by 2045.\n* **Infrastructure Retirement:** Approximately 7 GW of coal capacity will be retired between 2029 and 2033, with the remaining 5 GW to be phased out by 2044.\n* **Governance Framework:** MyPOWER Corp has been designated as the Nuclear Energy Programme Implementing Organization (NEPIO) to align with International Atomic Energy Agency (IAEA) standards.\n* **Technology Focus:** The government is prioritizing Small Modular Reactors (SMRs) and exploring floating nuclear power plant technology for better scalability and safety.\n\n### 中文\n* **政策整合：** 第13次马来西亚计划（RMK13，2026-2030）正式将核能纳入国家能源结构，旨在加强能源安全并支持2050年净零排放目标。\n* **脱碳目标：** 马来西亚计划到2040年实现40%的可再生能源占比，2050年达到70%，并于2045年前完全淘汰燃煤电厂。\n* **设施退役：** 约7吉瓦（GW）的燃煤发电产能计划在2029至2033年间退役，其余5吉瓦将在2044年前完成淘汰。\n* **治理框架：** MyPOWER Corp已被指定为核能项目实施组织（NEPIO），负责确保项目符合国际原子能机构（IAEA）的标准。\n* **技术重点：** 政府正优先考虑小型模块化反应堆（SMR），并研究浮动式核电站技术，以实现更好的可扩展性和安全性。","html_content":"<h3>English</h3>\n<ul>\n<li><strong>Policy Integration:</strong> The 13th Malaysia Plan (RMK13, 2026–2030) officially incorporates nuclear power to strengthen energy security and support the 2050 Net-Zero target.</li>\n<li><strong>Decarbonization Targets:</strong> Malaysia aims for 40% renewable energy by 2040 and 70% by 2050, with a full phase-out of coal-fired power plants by 2045.</li>\n<li><strong>Infrastructure Retirement:</strong> Approximately 7 GW of coal capacity will be retired between 2029 and 2033, with the remaining 5 GW to be phased out by 2044.</li>\n<li><strong>Governance Framework:</strong> MyPOWER Corp has been designated as the Nuclear Energy Programme Implementing Organization (NEPIO) to align with International Atomic Energy Agency (IAEA) standards.</li>\n<li><strong>Technology Focus:</strong> The government is prioritizing Small Modular Reactors (SMRs) and exploring floating nuclear power plant technology for better scalability and safety.</li>\n</ul>\n<h3>中文</h3>\n<ul>\n<li><strong>政策整合：</strong> 第13次马来西亚计划（RMK13，2026-2030）正式将核能纳入国家能源结构，旨在加强能源安全并支持2050年净零排放目标。</li>\n<li><strong>脱碳目标：</strong> 马来西亚计划到2040年实现40%的可再生能源占比，2050年达到70%，并于2045年前完全淘汰燃煤电厂。</li>\n<li><strong>设施退役：</strong> 约7吉瓦（GW）的燃煤发电产能计划在2029至2033年间退役，其余5吉瓦将在2044年前完成淘汰。</li>\n<li><strong>治理框架：</strong> MyPOWER Corp已被指定为核能项目实施组织（NEPIO），负责确保项目符合国际原子能机构（IAEA）的标准。</li>\n<li><strong>技术重点：</strong> 政府正优先考虑小型模块化反应堆（SMR），并研究浮动式核电站技术，以实现更好的可扩展性和安全性。</li>\n</ul>\n","author":"Solar PV Expert","tags":"","meta_description":"    English     Policy Integration:   The 13th Malaysia Plan (RMK13, 2026–2030) officially incorporates nuclear power to strengthen energy security an","published":true,"created_at":"2026-06-10T10:32:53.987Z","updated_at":"2026-06-12T06:52:28.170Z","source_url":"https://www.nuclearbusiness-platform.com/media/insights/malaysia-nuclear-comeback","source_name":null,"published_at":null,"noindex":false,"marketing_line":"Stay ahead of Malaysia energy policies. Eternalgy helps you navigate solar & EV incentives: https://eternalgy.me/malaysia-revives-nuclear-energy-ambitions-to-achieve-net-zero-goals","marketing_line_cn":"紧跟马来西亚能源政策。Eternalgy助您把握太阳能和电动汽车补贴机遇：https://eternalgy.me/malaysia-revives-nuclear-energy-ambitions-to-achieve-net-zero-goals"},"schemaData":{"@context":"https://schema.org","@graph":[{"@type":"NewsArticle","@id":"https://eternalgy.me/malaysia-revives-nuclear-energy-ambitions-to-achieve-net-zero-goals#newsarticle","headline":"Malaysia Revives Nuclear Energy Ambitions to Achieve Net-Zero Goals","description":"    English     Policy Integration:   The 13th Malaysia Plan (RMK13, 2026–2030) officially incorporates nuclear power to strengthen energy security and support ","image":["https://eternalgy.me/logo.png"],"datePublished":"2026-06-10T10:32:53.987Z","dateModified":"2026-06-12T06:52:28.170Z","author":{"@type":"Person","name":"Solar PV Expert"},"publisher":{"@type":"Organization","name":"Eternalgy Sdn Bhd","url":"https://eternalgy.me","logo":{"@type":"ImageObject","url":"https://eternalgy.me/logo.png"},"foundingDate":"2023-09-15","sameAs":["https://eternalgy.com","https://solarpanels.my","https://solarpanels.onesync.my","https://solar100.com.my"]},"mainEntityOfPage":"https://eternalgy.me/malaysia-revives-nuclear-energy-ambitions-to-achieve-net-zero-goals","isBasedOn":"https://www.nuclearbusiness-platform.com/media/insights/malaysia-nuclear-comeback"},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://eternalgy.me"},{"@type":"ListItem","position":2,"name":"Energy News","item":"https://eternalgy.me/news"},{"@type":"ListItem","position":3,"name":"Malaysia Revives Nuclear Energy Ambitions to Achieve Net-Zero Goals","item":"https://eternalgy.me/malaysia-revives-nuclear-energy-ambitions-to-achieve-net-zero-goals"}]}]}}