{"article":{"id":423,"slug":"malaysia-to-launch-first-highway-integrated-ev-charging-hub-by-2027","title":"Malaysia to Launch First Highway Integrated EV Charging Hub by 2027","category":"news","summary":"    English     Project Overview  : Malaysia is developing its first-ever integrated electric vehicle (EV) charging hub at the North–South Expressway southbound","content":"### English\n* **Project Overview**: Malaysia is developing its first-ever integrated electric vehicle (EV) charging hub at the North–South Expressway southbound Rest and Relax (R&R) area in Seremban.\n* **Investment and Timeline**: The project has an estimated cost of RM12 million and is expected to be fully operational by early 2027.\n* **Technical Specifications**: The hub will feature 20 high-performance DC fast-charging points capable of charging EVs in 20 to 30 minutes, with a total installed capacity of 1.2 MW.\n* **Integrated Facilities**: The site will include eight duplex retail and F&B outlets, drive-thru services, public restrooms, a surau, and solar-ready infrastructure.\n* **Strategic Partnership**: The hub is a joint venture between PLUS Malaysia and Yinson GreenTech, operating under the name \"Terra ChargEV\".\n* **National Goals**: This initiative supports Malaysia’s Low Carbon Mobility Blueprint and the National Energy Transition Roadmap, with PLUS aiming for 350 EV charging points nationwide by 2028.\n\n### 中文\n* **项目概览**：马来西亚首个综合电动汽车（EV）充电中心正在南北大道芙蓉南向休息站（R&R）建设中。\n* **投资与时间表**：该项目预计耗资 1200 万令吉，预计将于 2027 年初全面投入运营。\n* **技术规格**：该中心将配备 20 个高性能直流（DC）快充桩，充电时长仅需 20 至 30 分钟，总装机容量为 1.2 兆瓦（MW）。\n* **综合配套设施**：中心将包含 8 个双层零售与餐饮门店、得来速（Drive-thru）服务、公共厕所、祈祷室（Surau）以及太阳能就绪的基础设施。\n* **战略合作**：该充电中心由马来西亚大道局（PLUS）与 Yinson GreenTech 合资成立，项目名称为“Terra ChargEV”。\n* **国家目标**：此举旨在响应马来西亚《低碳交通蓝图》与《国家能源转型路线图》，PLUS 计划到 2028 年在全国范围内建成 350 个电动汽车充电点。","html_content":"<h3>English</h3>\n<ul>\n<li><strong>Project Overview</strong>: Malaysia is developing its first-ever integrated electric vehicle (EV) charging hub at the North–South Expressway southbound Rest and Relax (R&amp;R) area in Seremban.</li>\n<li><strong>Investment and Timeline</strong>: The project has an estimated cost of RM12 million and is expected to be fully operational by early 2027.</li>\n<li><strong>Technical Specifications</strong>: The hub will feature 20 high-performance DC fast-charging points capable of charging EVs in 20 to 30 minutes, with a total installed capacity of 1.2 MW.</li>\n<li><strong>Integrated Facilities</strong>: The site will include eight duplex retail and F&amp;B outlets, drive-thru services, public restrooms, a surau, and solar-ready infrastructure.</li>\n<li><strong>Strategic Partnership</strong>: The hub is a joint venture between PLUS Malaysia and Yinson GreenTech, operating under the name &quot;Terra ChargEV&quot;.</li>\n<li><strong>National Goals</strong>: This initiative supports Malaysia’s Low Carbon Mobility Blueprint and the National Energy Transition Roadmap, with PLUS aiming for 350 EV charging points nationwide by 2028.</li>\n</ul>\n<h3>中文</h3>\n<ul>\n<li><strong>项目概览</strong>：马来西亚首个综合电动汽车（EV）充电中心正在南北大道芙蓉南向休息站（R&amp;R）建设中。</li>\n<li><strong>投资与时间表</strong>：该项目预计耗资 1200 万令吉，预计将于 2027 年初全面投入运营。</li>\n<li><strong>技术规格</strong>：该中心将配备 20 个高性能直流（DC）快充桩，充电时长仅需 20 至 30 分钟，总装机容量为 1.2 兆瓦（MW）。</li>\n<li><strong>综合配套设施</strong>：中心将包含 8 个双层零售与餐饮门店、得来速（Drive-thru）服务、公共厕所、祈祷室（Surau）以及太阳能就绪的基础设施。</li>\n<li><strong>战略合作</strong>：该充电中心由马来西亚大道局（PLUS）与 Yinson GreenTech 合资成立，项目名称为“Terra ChargEV”。</li>\n<li><strong>国家目标</strong>：此举旨在响应马来西亚《低碳交通蓝图》与《国家能源转型路线图》，PLUS 计划到 2028 年在全国范围内建成 350 个电动汽车充电点。</li>\n</ul>\n","author":"Solar PV Expert","tags":"","meta_description":"    English     Project Overview  : Malaysia is developing its first-ever integrated electric vehicle (EV) charging hub at the North–South Expressway ","published":true,"created_at":"2026-06-10T11:58:17.197Z","updated_at":"2026-06-12T06:52:19.863Z","source_url":"https://bernama.com/en/general/news.php?id=2479687","source_name":null,"published_at":null,"noindex":false,"marketing_line":"Eternalgy delivers EV charging & solar PV solutions across Malaysia. Power your property with clean energy: https://eternalgy.me/malaysia-to-launch-first-highway-integrated-ev-charging-hub-by-2027","marketing_line_cn":"Eternalgy为全马提供电动汽车充电桩和太阳能光伏发电方案。用清洁能源为您的产业赋能：https://eternalgy.me/malaysia-to-launch-first-highway-integrated-ev-charging-hub-by-2027"},"schemaData":{"@context":"https://schema.org","@graph":[{"@type":"NewsArticle","@id":"https://eternalgy.me/malaysia-to-launch-first-highway-integrated-ev-charging-hub-by-2027#newsarticle","headline":"Malaysia to Launch First Highway Integrated EV Charging Hub by 2027","description":"    English     Project Overview  : Malaysia is developing its first-ever integrated electric vehicle (EV) charging hub at the North–South Expressway southbound","image":["https://eternalgy.me/logo.png"],"datePublished":"2026-06-10T11:58:17.197Z","dateModified":"2026-06-12T06:52:19.863Z","author":{"@type":"Person","name":"Solar PV Expert"},"publisher":{"@type":"Organization","name":"Eternalgy Sdn Bhd","url":"https://eternalgy.me","logo":{"@type":"ImageObject","url":"https://eternalgy.me/logo.png"},"foundingDate":"2023-09-15","sameAs":["https://eternalgy.com","https://solarpanels.my","https://solarpanels.onesync.my","https://solar100.com.my"]},"mainEntityOfPage":"https://eternalgy.me/malaysia-to-launch-first-highway-integrated-ev-charging-hub-by-2027","isBasedOn":"https://bernama.com/en/general/news.php?id=2479687"},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://eternalgy.me"},{"@type":"ListItem","position":2,"name":"Energy News","item":"https://eternalgy.me/news"},{"@type":"ListItem","position":3,"name":"Malaysia to Launch First Highway Integrated EV Charging Hub by 2027","item":"https://eternalgy.me/malaysia-to-launch-first-highway-integrated-ev-charging-hub-by-2027"}]}]}}