{"article":{"id":240,"slug":"malaysias-first-247-solar-power-plant-set-for-sarawak-with-usdollar548m-investment","title":"Malaysia’s First 24/7 Solar Power Plant Set for Sarawak with US$548M Investment","category":"news","summary":"    English Summary     Investment Milestone  : Planet QEOS Sdn Bhd has signed agreements worth US$548 million (RM2.32 billion) to develop the Baram DeepTech En","content":"### English Summary\n* **Investment Milestone**: Planet QEOS Sdn Bhd has signed agreements worth US$548 million (RM2.32 billion) to develop the Baram DeepTech Energy Program in Sarawak.\n* **Technology & Reliability**: The project introduces Malaysia’s first \"firm\" solar power plant, integrating large-scale solar arrays with multi-gigawatt-hour battery storage to provide dispatchable, 24-hour renewable electricity.\n* **Capacity & Scope**: Phase 1 includes a 155 MWp solar farm and 310 MWh battery storage, aiming to match the reliability of gas and hydropower.\n* **Strategic Partnerships**: Five strategic partners, including China Construction Sixth Engineering Bureau (CSCEC), are involved in infrastructure development, solar/battery co-development, and agrovoltaic integration.\n* **Community Impact**: The initiative features a 650-hectare agrovoltaic farm for high-value crop cultivation, projected to create over 500 rural jobs and enhance regional food security.\n* **Regional Goal**: Aligns with Sarawak’s Energy Transition Policy (SET-P) to become the \"Battery of ASEAN\" and reach 10GW generation capacity by 2030.\n\n### 中文摘要\n* **投资里程碑**：Planet QEOS Sdn Bhd 已签署价值 5.48 亿美元（23.2 亿令吉）的协议，用于开发砂拉越的巴兰 (Baram) 深科技能源项目。\n* **技术与稳定性**：该项目将打造马来西亚首座“稳态”太阳能发电厂，通过大型太阳能阵列结合兆瓦时级电池储能系统，实现全天候 24 小时的可调度清洁电力供应。\n* **容量与规模**：第一阶段计划建设 155 MWp 的太阳能电站和 310 MWh 的电池储能系统，旨在实现媲美天然气和水力发电的供电可靠性。\n* **战略合作**：包括中国建筑第六工程局在内的五家战略合作伙伴将参与基础设施建设、储能开发及农业光伏集成。\n* **社区贡献**：项目包含 650 公顷的农光互补（agrovoltaic）农场，旨在种植高价值农作物，预计创造 500 多个农村就业岗位并增强区域粮食安全。\n* **区域愿景**：该项目响应砂拉越能源转型政策 (SET-P)，助力砂拉越实现到 2030 年达到 10GW 发电容量的目标，并成为“东盟电池”和清洁能源出口中心。","html_content":"<h3>English Summary</h3>\n<ul>\n<li><strong>Investment Milestone</strong>: Planet QEOS Sdn Bhd has signed agreements worth US$548 million (RM2.32 billion) to develop the Baram DeepTech Energy Program in Sarawak.</li>\n<li><strong>Technology &amp; Reliability</strong>: The project introduces Malaysia’s first &quot;firm&quot; solar power plant, integrating large-scale solar arrays with multi-gigawatt-hour battery storage to provide dispatchable, 24-hour renewable electricity.</li>\n<li><strong>Capacity &amp; Scope</strong>: Phase 1 includes a 155 MWp solar farm and 310 MWh battery storage, aiming to match the reliability of gas and hydropower.</li>\n<li><strong>Strategic Partnerships</strong>: Five strategic partners, including China Construction Sixth Engineering Bureau (CSCEC), are involved in infrastructure development, solar/battery co-development, and agrovoltaic integration.</li>\n<li><strong>Community Impact</strong>: The initiative features a 650-hectare agrovoltaic farm for high-value crop cultivation, projected to create over 500 rural jobs and enhance regional food security.</li>\n<li><strong>Regional Goal</strong>: Aligns with Sarawak’s Energy Transition Policy (SET-P) to become the &quot;Battery of ASEAN&quot; and reach 10GW generation capacity by 2030.</li>\n</ul>\n<h3>中文摘要</h3>\n<ul>\n<li><strong>投资里程碑</strong>：Planet QEOS Sdn Bhd 已签署价值 5.48 亿美元（23.2 亿令吉）的协议，用于开发砂拉越的巴兰 (Baram) 深科技能源项目。</li>\n<li><strong>技术与稳定性</strong>：该项目将打造马来西亚首座“稳态”太阳能发电厂，通过大型太阳能阵列结合兆瓦时级电池储能系统，实现全天候 24 小时的可调度清洁电力供应。</li>\n<li><strong>容量与规模</strong>：第一阶段计划建设 155 MWp 的太阳能电站和 310 MWh 的电池储能系统，旨在实现媲美天然气和水力发电的供电可靠性。</li>\n<li><strong>战略合作</strong>：包括中国建筑第六工程局在内的五家战略合作伙伴将参与基础设施建设、储能开发及农业光伏集成。</li>\n<li><strong>社区贡献</strong>：项目包含 650 公顷的农光互补（agrovoltaic）农场，旨在种植高价值农作物，预计创造 500 多个农村就业岗位并增强区域粮食安全。</li>\n<li><strong>区域愿景</strong>：该项目响应砂拉越能源转型政策 (SET-P)，助力砂拉越实现到 2030 年达到 10GW 发电容量的目标，并成为“东盟电池”和清洁能源出口中心。</li>\n</ul>\n","author":"Solar PV Expert","tags":"","meta_description":"    English Summary     Investment Milestone  : Planet QEOS Sdn Bhd has signed agreements worth US$548 million (RM2.32 billion) to develop the Baram D","published":true,"created_at":"2026-06-10T10:35:22.358Z","updated_at":"2026-06-12T06:52:27.384Z","source_url":"https://www.digitalnewsasia.com/business/us548mil-deals-ignite-malaysias-first-247-solar-power-plant-sarawak","source_name":null,"published_at":null,"noindex":false,"marketing_line":"Eternalgy is your trusted solar PV EPC in Malaysia — CIDB G3 & SEDA RPVI certified. Go solar: https://eternalgy.me/malaysias-first-247-solar-power-plant-set-for-sarawak-with-usdollar548m-investment","marketing_line_cn":"Eternalgy是您值得信赖的马来西亚太阳能光伏EPC——持有CIDB G3和SEDA RPVI认证。立即选择太阳能：https://eternalgy.me/malaysias-first-247-solar-power-plant-set-for-sarawak-with-usdollar548m-investment"},"schemaData":{"@context":"https://schema.org","@graph":[{"@type":"NewsArticle","@id":"https://eternalgy.me/malaysias-first-247-solar-power-plant-set-for-sarawak-with-usdollar548m-investment#newsarticle","headline":"Malaysia’s First 24/7 Solar Power Plant Set for Sarawak with US$548M Investment","description":"    English Summary     Investment Milestone  : Planet QEOS Sdn Bhd has signed agreements worth US$548 million (RM2.32 billion) to develop the Baram DeepTech En","image":["https://eternalgy.me/logo.png"],"datePublished":"2026-06-10T10:35:22.358Z","dateModified":"2026-06-12T06:52:27.384Z","author":{"@type":"Person","name":"Solar PV Expert"},"publisher":{"@type":"Organization","name":"Eternalgy Sdn Bhd","url":"https://eternalgy.me","logo":{"@type":"ImageObject","url":"https://eternalgy.me/logo.png"},"foundingDate":"2023-09-15","sameAs":["https://eternalgy.com","https://solarpanels.my","https://solarpanels.onesync.my","https://solar100.com.my"]},"mainEntityOfPage":"https://eternalgy.me/malaysias-first-247-solar-power-plant-set-for-sarawak-with-usdollar548m-investment","isBasedOn":"https://www.digitalnewsasia.com/business/us548mil-deals-ignite-malaysias-first-247-solar-power-plant-sarawak"},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://eternalgy.me"},{"@type":"ListItem","position":2,"name":"Energy News","item":"https://eternalgy.me/news"},{"@type":"ListItem","position":3,"name":"Malaysia’s First 24/7 Solar Power Plant Set for Sarawak with US$548M Investment","item":"https://eternalgy.me/malaysias-first-247-solar-power-plant-set-for-sarawak-with-usdollar548m-investment"}]}]}}