English

  • Market Growth: Malaysia’s top 10 Charge Point Operators (CPOs) expanded their combined network by 55.8% in 2025, reaching 3,894 total charging points.
  • Top Leaders: ChargeSini leads the market with 1,110 points, followed by JomCharge (680) and ChargeEV (501).
  • The 'Agility Gap': Private firms are deploying infrastructure significantly faster than government-linked entities by streamlining site acquisition and prioritizing high-turnover DC fast chargers.
  • DC Charging Milestone: Malaysia has exceeded its national target for DC fast chargers, deploying over 1,700 units (13% above the original 1,500 target).
  • Strategic Shifts: CPOs are prioritizing DC over AC charging to improve ROI through higher daily turnover rates, effectively addressing long-distance travel range anxiety.

中文

  • 市场增长: 2025年,马来西亚排名前10的充电运营商(CPO)基础设施总量增长了55.8%,总计达到3,894个充电桩。
  • 行业领先者: ChargeSini以1,110个充电桩位居市场榜首,其次是JomCharge(680个)和ChargeEV(501个)。
  • 敏捷度差距: 民营企业通过简化场地获取流程,并优先部署高周转率的直流(DC)快充,其基础设施部署速度远超政府关联企业。
  • 直流快充里程碑: 马来西亚已超额完成国家直流快充目标,全国部署量超过1,700个,超出原定1,500个的目标13%。
  • 战略转型: 运营商正将重心从交流(AC)充电转向直流(DC)快充,旨在通过提高日周转率来优化投资回报(ROI),有效缓解长途驾驶的续航焦虑。