CAPACITY
1200.00kWp
CLIENT PARTNER
Apex Manufacturing Sdn Bhd
COMMISSIONED: November 2025
Apex Manufacturing 1.2MWp Case Study
This utility-interconnected commercial solar system utilized 1,790 units of Jinko modules and SAJ commercial string inverters. Engineered by Eternalgy's 1st-party engineering team.
Results
- Annual Generation: 1,680 MWh
- CO2 Reduction: 980 tonnes/year
- Payback Period: 4.2 years
