English

  • Project Launch: The Cenergi Aeropolis Renewable Energy (CARE) project at Kuala Lumpur International Airport (KLIA) was officially launched on January 29, 2026.
  • Core Infrastructure: The initiative integrates a photovoltaic solar farm with a Battery Energy Storage System (BESS) to enhance grid stability.
  • Performance Metrics: The project is designed to generate 46 GWh of green electricity annually.
  • Environmental Impact: Expected to reduce carbon dioxide emissions by approximately 35,000 tonnes per year, equivalent to removing 8,000 vehicles from the road.
  • Operational Benefits: BESS technology allows for storing surplus solar energy for peak demand usage, optimizing load management and reducing electricity costs.
  • Strategic Goals: The project supports Malaysia Airports Holdings Berhad (MAHB) in achieving a 20% renewable energy mix by 2030 and net-zero emissions by 2050.

中文

  • 项目启动:吉隆坡国际机场 (KLIA) 的 Cenergi Aeropolis 可再生能源 (CARE) 项目于 2026 年 1 月 29 日正式启动。
  • 核心基础设施:该项目整合了光伏太阳能电场与电池储能系统 (BESS),旨在提升电网稳定性。
  • 能源产出:预计每年可产生 46 GWh 的绿色电力。
  • 环保贡献:每年预计可减少约 35,000 吨二氧化碳排放,相当于减少 8,000 辆汽车上路。
  • 运营优势:电池储能系统可存储白天的盈余太阳能供高峰时段使用,优化负荷管理并降低电费支出。
  • 战略目标:该项目助力马来西亚机场控股公司 (MAHB) 实现 2030 年可再生能源占比达到 20%,以及 2050 年实现净零排放的目标。