Renewable Energy News
Malaysia Expands Battery Storage to Support Renewable Energy Goals
English
- Strategic Deployment: Malaysia is accelerating the rollout of Battery Energy Storage Systems (BESS) to manage power flows and improve grid stability amid rising solar adoption.
- Key Infrastructure: Large-scale solar (LSS) tenders now require integrated battery storage components to ensure power supply matches actual demand.
- Recent Milestone: A 100-megawatt BESS project was inaugurated in Terengganu on May 18, 2026, serving approximately 40,000 users.
- Renewable Targets: As of December 2025, Malaysia’s renewable capacity reached 12 GW (31% of total capacity), with targets set at 40% by 2035 and 70% by 2050.
中文
- 战略部署:马来西亚正在加速部署电池储能系统 (BESS),以在太阳能装机量不断增加的情况下优化电力调度并提升电网稳定性。
- 核心基建:目前所有的大型太阳能 (LSS) 项目招标均要求集成储能组件,以确保发电量与实际用电需求匹配。
- 最新进展:2026年5月18日,位于登嘉楼州的一个100兆瓦 BESS 项目正式启用,预计将惠及约40,000名用户。
- 能源目标:截至2025年12月,马来西亚的可再生能源装机容量达到12吉瓦 (占总装机量的31%),目标是在2035年提升至40%,并在2050年达到70%。
Source:
Original Article ↗
