English

  • Infrastructure Goal: Penang aims to install 600 electric vehicle (EV) charging bays across the state by 2030.
  • Current Progress: The state currently has between 200 and 300 operational charging bays, with local authorities and private commercial buildings actively expanding coverage.
  • Key Challenges: Safety concerns remain the primary hurdle for installing charging infrastructure within high-rise residential buildings.
  • National Context: Malaysia is working toward a national target of 10,000 public EV charging bays by 2025 and seeks to have EVs account for 15% of total industry volume by 2030.
  • Market Growth: EV sales in Malaysia doubled in 2025 to over 30,000 units, highlighting a strong upward trend in green mobility adoption.

中文

  • 基础设施目标:槟城计划在2030年前在全州安装600个电动汽车(EV)充电桩。
  • 当前进展:目前州内已拥有200至300个充电桩,地方政府及私人商业建筑正积极扩大覆盖范围。
  • 主要挑战:在公寓及共管公寓等高层住宅内安装充电基础设施,安全性仍是首要考量问题。
  • 国家目标:马来西亚正朝着2025年实现1万个公共充电桩的目标迈进,并计划在2030年使电动汽车占汽车行业总销量的15%。
  • 市场增长:2025年马来西亚电动汽车销量翻倍,超过3万辆,凸显了绿色交通普及的强劲增长势头。