Renewable Energy News
Penang Sets New Roadmap for EV Infrastructure Expansion by 2030
English
- New Charging Target: The Penang state government has set a target to reach 600 public electric vehicle (EV) charging bays by 2030.
- Current Progress: The state currently hosts between 200 and 300 charging bays, with the new timeline extending the previous 2025 goal by five years.
- Implementation Strategy: The Penang Island City Council (MBPP) is actively converting existing public parking lots and shopping center spaces into EV charging bays.
- Residential Challenges: Chief Minister Chow Kon Yeow highlighted that safety concerns remain the primary hurdle for installing charging infrastructure in high-rise residential buildings like condominiums.
- Market Growth: EV adoption in Malaysia is gaining momentum, with sales more than doubling to over 30,000 units in 2025.
- Holistic Approach: The government emphasizes that successful EV transition requires a coordinated effort between industry participation, technological readiness, and supportive policy frameworks.
中文
- 充电设施新目标: 槟城州政府已设定目标,计划在2030年之前实现600个公共电动汽车(EV)充电桩。
- 当前进度: 槟城目前拥有200至300个充电桩,此次新的时间表将之前2025年的目标延长了五年。
- 实施策略: 槟岛市政厅(MBPP)正积极将现有的公共停车场和购物中心空间改造为电动汽车充电位。
- 住宅挑战: 槟城首席部长曹观友指出,安全隐患仍是在高层住宅(如公寓)安装充电设施的主要障碍。
- 市场增长: 马来西亚的电动汽车普及率正在增长,2025年销量增长了一倍多,超过30,000辆。
- 全面方针: 政府强调,电动汽车的成功转型需要行业参与、技术准备和政策框架之间的协调配合。
Source:
Original Article ↗
